Jump to content

Recommended Posts

Posted

Grounding of equipment and bonding of all permanent installed metallic items in and around pools is always a concern of mine. What do you think and say about metal downspout within 4' and metal guttering/roof drip edge within 8'6" as depicted?

Download Attachment: icon_photo.gif Metalgutterpool.JPG

94.93 KB

Posted
Originally posted by BADAIR

Grounding of equipment and bonding of all permanent installed metallic items in and around pools is always a concern of mine. What do you think and say about metal downspout within 4' and metal guttering/roof drip edge within 8'6" as depicted?

Download Attachment: icon_photo.gif Metalgutterpool.JPG

94.93 KB

The downspout requires bonding.

  • 8 months later...
Posted

(5) Metal Wiring Methods and Equipment. Metalsheathed

cables and raceways, metal piping, and all fixed

metal parts except those separated from the pool by a permanent

barrier shall be bonded that are within the following

distances of the pool:

(1) Within 1.5 m (5 ft) horizontally of the inside walls of

the pool

(2) Within 3.7 m (12 ft) measured vertically above the

maximum water level of the pool, or any observation

stands, towers, or platforms, or any diving structures

Yep, in this picture it should be bonded.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...