Nolan Kienitz Posted October 15, 2015 Report Share Posted October 15, 2015 Kind of cool ... [utube]https://www.youtube.com/watch?v=B6X82g2UZOs" type="application/x-shockwave-flash" wmode="transparent" width="425" height="344"> Link to comment Share on other sites More sharing options...
Marc Posted October 15, 2015 Report Share Posted October 15, 2015 An engineering marvel! Looks like the section was positioned all in one day. Marc Link to comment Share on other sites More sharing options...
Les Posted October 16, 2015 Report Share Posted October 16, 2015 that is really cool. Link to comment Share on other sites More sharing options...
tim5055 Posted October 16, 2015 Report Share Posted October 16, 2015 They are amazing machines. For the last year I lived in the DC area they used two similar horizontal cranes installing the train "bridges" for the Washington Metro extension through the Tysons Corner area of McLean, VA. They basically set one or two sections of the elevated track each day for miles. http://www.dullesmetro.com/project-stat ... ns-corner/ Link to comment Share on other sites More sharing options...
Steven Hockstein Posted October 17, 2015 Report Share Posted October 17, 2015 that is really cool. I agree. Thanks for sharing. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now